“The whole point of the Murray-Darling Basin Plan was to restore the health of the dying river by taking some of the overallocated water away from irrigators and putting some of the water back in the system.”
http://www.abc.net.au/news/rural/2018-06-10/no-new-dams-in-the-20-year-nsw-water-plan/9850064